Installation of your system encompasses four separate steps:
The uncrating and installation of the NextDent 5100 will be performed by the printer operator. The weight of the printer requires a minimum of two people to lift it safely.
The installation of the system should only take an hour or less.
In preparing your facility for NextDent system placement, you must consider four main factors:
Most standard doorways and halls provide adequate access for moving the system. If the NextDent 5100 Printer is lifted on its narrow side, each passageway and doorway must be wide enough to move and turn a printer measuring 42.6 x 48.9 x 97.2 cm (16.8 x 19.3 x 38.3 in), in addition to accommodating the people or equipment used to move the printer.
Determine the pathway from where the crated components are stored to where your NextDent system will be installed. Walk the path from the storage location to the final destination of the system, and measure any critical doorways or passageways to ensure that the equipment can be moved through the area.
If a passageway or doorway is too small for the crated NextDent system, it may be necessary to remove the NextDent system from its crate before moving the unit. A standard door that is 2-2.4m (6.5-8 ft) tall and 0.61-1.1m (2-3.5 ft) wide should accommodate the system and its accessories.